ISLAMABAD, Jan 15: The government has asked the Pakistan Railways to replace old, obsolete and over-aged operational system and rolling stock of the organisation to ensure higher safety standards.

Officials told Dawn on Monday that the president and the prime minister had been informed recently that due to the aging of essential equipments, the possibility of its malfunctioning could not be ruled out, which could result in "serious mishap".

Both the leaders called for enhancing efficiency and credibility of the system through continuous monitoring and control of train movements on all sections.

The railway authorities have been directed to minimise the involvement of human elements and ensure quick operation of the signalling system. They have been asked to increase the line capacity by providing a base for future installation of centralised traffic control and high-speed train operation on the double-line sector.

The president and PM have asked the railway authorities to minimise chances of accidents in case of human failure like overshooting by the driver.

The officials said that the operation of cabin interlocked mechanical signalling was very slow and time-consuming. At junctions and big stations, mechanical operation of signal gear is very cumbersome causing delays, especially in the case of crossing of trains. Similarly, impaired visibility of kerosene-lit semaphore signals during night compels drivers to check speed.

The federal government has promised to initially provide Rs4.1 billion to replace old equipment. Since the signalling equipment is not manufactured in Pakistan, it is expected to be imported along with the transfer of technology.

The programme will augment and supplement the doubling of track from Lodhran to Multan to Khanewal and from Khanewal to the Raiwind section. Track rehabilitation from Landhi to Khanpur is also being done to run the trains at 120km/hr and higher speed.

The president and the prime minister have been informed that in the freight sector, 1,300 high-capacity wagons are being introduced and another 1,000 such wagons would be procured.

Opinion

Editorial

Energy inflation
Updated 23 May, 2024

Energy inflation

The widening gap between the haves and have-nots is already tearing apart Pakistan’s social fabric.
Culture of violence
23 May, 2024

Culture of violence

WHILE political differences are part of the democratic process, there can be no justification for such disagreements...
Flooding threats
23 May, 2024

Flooding threats

WITH temperatures in GB and KP forecasted to be four to six degrees higher than normal this week, the threat of...
Bulldozed bill
Updated 22 May, 2024

Bulldozed bill

Where once the party was championing the people and their voices, it is now devising new means to silence them.
Out of the abyss
22 May, 2024

Out of the abyss

ENFORCED disappearances remain a persistent blight on fundamental human rights in the country. Recent exchanges...
Holding Israel accountable
22 May, 2024

Holding Israel accountable

ALTHOUGH the International Criminal Court’s prosecutor wants arrest warrants to be issued for Israel’s prime...